MSCBSC 移動通信論壇
搜索
登錄注冊
網(wǎng)絡(luò)優(yōu)化工程師招聘專欄 4G/LTE通信工程師最新職位列表 通信實習(xí)生/應(yīng)屆生招聘職位

  • 閱讀:2249
  • 回復(fù):1
西門子de52升級de62
chenhaiyuan2000
鉆石會員



 發(fā)短消息    關(guān)注Ta 

積分 10250
帖子 133
威望 1887 個
禮品券 0 個
專家指數(shù) 0
注冊 2007-5-17
專業(yè)方向  網(wǎng)優(yōu)
回答問題數(shù) 0
回答被采納數(shù) 0
回答采納率 0%
 
發(fā)表于 2007-06-08 10:17:25  只看樓主 
【資料成文時間】:2006
【語言】:英文
【頁數(shù)】:
【何人(公司)所著】:simens
【文件格式】:pdf
【文件原名】:印尼SND升級DE52-DE62
【摘要或目錄】:186
1. INTRODUCTION...................................................................................................................0-1
1.1. Subject of the Procedure......................................................................................................1-1
1.2. Objective of the Procedure...................................................................................................1-1
1.3. Phases of the Procedure......................................................................................................1-2
1.4. Position in the Process with Procedure Interfaces ..............................................................1-3
1.5. Scope of HW/FW/SW to be upgraded.................................................................................1-4
1.5.1. Initial Status of the HW / SN(B)E52...............................................................1-4
1.5.2. Target Status of the HW / SN(D) DE62............................................................1-4
1.6. Time Requirements for the Execution..................................................................................1-5
1.6.1. Protection against Electrostatic Discharge ......................................................1-6
1.6.2. Handling of Cabling ...........................................................................................1-6
1.6.3. Handling of HW / FW Modifications ..................................................................1-6
How to read this Procedure.........................................................................................................1-7
2. PREREQUISITES ..................................................................................................................2-1
2.1. Hardware / Firmware............................................................................................................2-1
2.1.1. Required Status ................................................................................................2-1
2.1.2. Aditional Equipment for System Upgrade .........................................................2-1
2.1.3. Test / Reference System ..................................................................................2-1
2.1.4. Installation Requirements..................................................................................2-2
2.2. Software / Tools....................................................................................................................2-3
2.2.1. System Upgrade - Command Files ..................................................................2-3
2.2.2. System Upgrade - Patch Files ..........................................................................2-3
2.2.3. Charging data treatment on SS ........................................................................2-3
2.2.4. Charging files on CP MDD................................................................................2-3
2.2.5. Charging files on MP MDD (SAMAR handling) .................................................2-4
2.2.6. LOG-File handling .............................................................................................2-5
2.3. Documentation .....................................................................................................................2-5
3. BASIC OPERATION...............................................................................................................3-1
Overview / Flow Diagram ............................................................................................................3-1
3.1. Phase 1: Preparation............................................................................................................3-2
3.2. Phase 2: Expansion from SN(B)E52 (252 LTG) to SN(D)E62 (504 LTG), Side 1 .......3-3
3.3. Phase 3: Expansion from SN(B):DE52 (252 LTG) to SN(D):DE62 (504 LTG), Side 0 .......3-5
4. PHASE 1: PREPARAT ION.....................................................................................................3-1
4.1. Installation of SN(D)-Racks and MBD..................................................................................4-1
4.1.1. Installation of MBD (if necessary) and Internal Cabling ....................................4-1
4.1.2. Installation of SND .............................................................................................4-1
4.1.3. Cabling of SN(D) and MB(D).............................................................................4-2
4.1.4. Prelaying the Cables MB(D) – SN(D) (Cable Group N)....................................4-2
4.1.5. Prelaying the Cables of Cable Group R, SNMAT - SNMUX..............................4-3
4.1.6. Prelaying the Cables of Cable Group R, SNMUX - SNCARE...........................4-3
4.1.7. Prelaying Cables of Cable Grp. R, SNMUX/SNCARE - LTG............................4-3
4.1.8. Prelaying Voltage Cables for the new F:SNMUX(A)..........................................4-4
4.1.9. Preparation Hints for the SN(D) ........................................................................4-4
4.2. Check the Installation and Cabling .......................................................................................4-5
4.3.Checking the old Cabling of Cable Group R, TSG(B) - LTG.................................................4-5
4.3.1. Checking the Cabling SNMUX(A) and LTG.......................................................4-6
0-4 P30305-X1118-U280-01-7618
4.4. Establishing a Test Concept................................................................................................ 4-6
4.5. Installation of OMT-1 ............................................................................................................ 4-6
4.6. Transferring Command Files to MDD and Test of CP113C ............................................... 4-8
4.7. Expansion of MB(D) (MBDA) (if necessary) ........................................................................ 4-9
4.8. Diagnosis of MB(D) and SN(B)............................................................................................ 4-9
4.8.1. Diagnosis of MB................................................................................................ 4-9
4.8.2. Diagnosis of SN.............................................................................................. 4-10
4.9. Preparation of SSNC and SC ............................................................................................ 4-10
4.9.1. Visual Check of the SSNC units..................................................................... 4-10
4.9.2. Alarm surveillance .......................................................................................... 4-10
4.9.3. Release of Access Control, RPPW and File security.................................... 4-11
4.9.4. Deletion of invalid event destination entries.................................................... 4-11
4.10. Saving current APS.......................................................................................................... 4-11
4.11. System Status Inquiry...................................................................................................... 4-13
5. PHASE 2: REPLACEMENT OF SNB:DE52/SN-1 TO SND:DE62/SN-1 ............................ 5-1
5.1. Configuration of MB / SN Side 1........................................................................................... 5-1
5.1.1. Switching off Power in Frames SSG(B) SN Side 1 ......................................... 5-1
5.1.2. Disconnect existing cabling SN:DE52(SNB-1) – MBD-1................................. 5-1
5.1.3. Plug in the Cable of SN:DE62/SN(D)-1 - MB(D)-1........................................... 5-2
5.1.4. Switching off Power in Frames TSG(B) SN Side 1.......................................... 5-2
5.1.5. Disconnecting Cables in Frames TSG(B) SN Side 1 ...................................... 5-2
5.1.6. Uninstalling Frames TSG(B) SN Side 1 ........................................................... 5-3
5.1.7. Installing Frames SNMUX(A) and SNCARE SN Side 1.................................... 5-3
5.1.8. Plug modules SND-1........................................................................................ 5-3
5.1.9. Cabling MBD-1 / SND-1.................................................................................... 5-3
5.1.10. Connecting Cables in Frame SNMUX(A) SN Side 1...................................... 5-4
5.1.11. Connecting Cables in Frame SNCARE SN Side 1........................................ 5-6
5.1.12. Connecting 0V in Frame SNCARE SN Side 1 ............................................... 5-7
5.1.13. Connecting Power and 0V in Frame SNMUX(A) SN Side 1........................... 5-7
5.1.14. Repetition of Procedure Steps ....................................................................... 5-7
5.1.15. Power Supply Test in System Side 1............................................................. 5-7
5.1.16. Checking the Power Supplies in System Side 1............................................ 5-7
5.2. Saving Single Files on MDD-1 ............................................................................................. 5-9
5.3. Saving of charging data........................................................................................................ 5-9
5.3.1. Switchover of the LOG file................................................................................ 5-9
5.4. CP - Split ............................................................................................................................ 5-11
5.4.1. Splitting the CP ............................................................................................... 5-11
5.4.2. Startup NSS in Installation mode.................................................................... 5-13
5.4.3. ODAGEN Expansion ...................................................................................... 5-14
5.5. Change of EXCHANGE data.............................................................................................. 5-16
5.6. Deleting all Generations with capacity stage DE52........................................................... 5-16
5.7. Configuration of Periphery.................................................................................................. 5-18
5.7.1. Configuration of the IOPMB's ......................................................................... 5-18
5.7.2. Configuration of the MBD/SND ....................................................................... 5-18
5.8. Diagnosis and Activation of System Side 1 ....................................................................... 5-18
5.8.1. Diagnosis/Activation of MB(D)-1..................................................................... 5-18
5.8.2. Diagnosis/Activation of SN(D)-1..................................................................... 5-20
5.9. LTG Status Display ............................................................................................................ 5-21
5.10. Last saving of charging data from Billing Center ............................................................. 5-22
5.11. Checking the Call-Processing Functions ........................................................................ 5-22
5.12. Deletion / Creation of charge files on CP-MDD-1............................................................ 5-22
5.13. Resetting the LOG-Function in the SSNC(C).................................................................. 5-24
5.14. Last saving of charging data on MDD.............................................................................. 5-25
P30305-X1118-U280-01-7618 0-5
5.15. Cutover .............................................................................................................................5-26
5.16. Handling after cutover.......................................................................................................5-30
5.16.1. Configuration of the ATMB ............................................................................5-30
5.16.2. Checking System Availability after System Recovery..................................5-30
5.16.3. Checking the Call-Processing Functions .....................................................5-34
5.16.4. Activation of the LOG-Function SSNC(C).....................................................5-35
6. PHASE 3: REPLACEMENT OF SNB:DE52/SN-0 TO SND:DE62/SN-0.............................6-1
6.1. Configuration of MB / SN Side 0 ...........................................................................................6-1
6.1.1. Switching off Power in Frames SSG(B) SN Side 1..........................................6-1
6.1.2. Disconnect existing cabling SN:DE52(SNB-0) – MBD-0..................................6-1
6.1.3. Plug in the Cable of SN:DE62/SN(D)-0 - MB(D)-0 ...........................................6-1
6.1.4. Switching off Power in Frames TSG(B) SN Side 0 ..........................................6-2
6.1.5. Disconnecting Cables in Frames TSG(B) SN Side 0.......................................6-2
6.1.6. Uninstalling Frames TSG(B) SN Side 0............................................................6-3
6.1.7. Installing Frames SNMUX(A) and SNCARE SN Side 0....................................6-3
6.1.8. Plug modules SND-0 .......................................................................................6-3
6.1.9. Cabling MBD-0 / SND-0....................................................................................6-3
6.1.10.Connecting Cables in Frame SNMUX(A) SN Side 0........................................6-4
6.1.11. Connecting Cables in Frame SNCARE SN Side 1.........................................6-5
6.1.12. Connecting 0V in Frame SNCARE SN Side 0................................................6-5
6.1.13. Connecting Power and 0V in Frame SNMUX(A) SN Side 0 ...........................6-5
6.1.14. Checking the Power Supplies in System Side 0 ............................................6-6
6.1.15. Repetition of Procedure Steps ........................................................................6-6
6.1.16. Power Supply Test in System Side 0 .............................................................6-6
6.1.17. Checking the Power Supplies in System Side 0 ............................................6-6
6.2. Diagnosis and Activation of System Side 0..........................................................................6-7
6.2.1. Diagnosis/Activation of MB(D)-0.......................................................................6-7
6.2.2. Diagnosis/Activation of SN(D)-0 .......................................................................6-7
6.3. Final work.............................................................................................................................6-8
6.3.1. Saving back charging data on CP-MDD...........................................................6-8
6.3.2. Activation of ATMB 2/3/4/5 side 0:.....................................................................6-8
6.3.3. Activation of CSC and X25 Links ......................................................................6-9
6.3.4. Deactivation of OMT-1 ......................................................................................6-9
6.3.5. Activation of Routine Tests ...............................................................................6-9
6.3.6. Checking System Availability ............................................................................6-9
6.3.7. Activation of MDD-0.........................................................................................6-13
6.3.8. Activation of Access Control, RPPW and Filesecurity ...................................6-13
6.3.9. Saving actual APS...........................................................................................6-14
6.3.10. Deleting initial DE Generations .....................................................................6-14
6.3.11. Deleting Command Files ..............................................................................6-14
6.4. Removing the old SN cables ..............................................................................................6-14
7. INTERRUPTING THE UPGRADE PROCEDURE...............................................................7-1
7.1. Fallback Procedure to initial DE type of SND .......................................................................7-1
7.1.1. Stop the CP.......................................................................................................7-1
7.1.2. Switching off Power in Frame SNMUX(A) Side 1 .............................................7-3
7.1.3. Switching on Power in Frames SN(B) Side 0...................................................7-3
7.1.4. Stop the System Operation with SN(D)/SN-1...................................................7-3
7.1.5. Configuration of the ATMB ................................................................................7-5
7.1.6. Checking System on CP...................................................................................7-6
7.1.7. Activation of BAP-0............................................................................................7-7
7.1.8. Checking System on SSNC..............................................................................7-8
0-6 P30305-X1118-U280-01-7618
7.1.9. Checking the Call-Processing Functions ....................................................... 7-10
7.1.10. Activation of MDD-1...................................................................................... 7-10
7.1.11. Cabling MBD-1 / SND-1................................................................................ 7-10
7.1.12. Disconnecting Cables in Frame SNMUX(A) SN Side 1 ............................... 7-10
7.1.13. Disconnecting Cables in Frame SNCARE SN Side 1 ................................. 7-11
7.1.14. Uninstalling Frames SNMUX(A) and SNCARE SN Side 1........................... 7-12
7.1.15. Installing Frames TSG(B) SN Side 1............................................................ 7-13
7.1.16. Connecting Cables in Frames TSG(B) SN Side 1....................................... 7-13
7.1.17. Connecting Power and 0V in Frames TSG(B) SN Side 1............................ 7-14
7.1.18. Switching on Power in Frames TSG(B) SN Side 1...................................... 7-14
7.1.19. Repetition of Procedure Steps ..................................................................... 7-15
7.1.20. Cabling of Cable Group N, SN - MB(D)........................................................ 7-15
7.1.20.1. Unplug the Cable of SN:DE62/SN(D)-1 - MB(D)-1........................ 7-15
7.1.20.2. Plug in the Cables of SN:DE52/SN(B)-1 - MB(D)-1 ...................... 7-15
7.1.21. Switching on Power in Frames SSG(B) SN Side 1 ..................................... 7-15
7.1.22. Activation of Periphery.................................................................................. 7-15
7.1.23. Activation of access control and file security ............................................... 7-15
7.1.24. Final tasks..................................................................................................... 7-16
8. ABBREVIATIONS .................................................................................................................. 8-1
9. REFERENCES...................................................................................................................... 9-1
10. APPENDIX......................................................................................................................... 10-1
10.1. Switching Network SN...................................................................................................... 10-1
SN Racks.................................................................................................................. 10-1
10.1.1. Rack Configuration SN(B):DE52.................................................................. 10-1
10.1.2. Rack Configuration SN(D):DE62.................................................................. 10-2
10.1.3. Rack Configuration SN(D):DE62 with SNCARE.......................................... 10-3
10.1.4. HW and FW for SN(B) and SN(D) ............................................................... 10-4
10.1.5. Frames for SN(B) ......................................................................................... 10-5
10.1.6. Frames for SN(D)......................................................................................... 10-6
10.1.7. Module Mounting Location/LTG Allocation TSG(B):DE5x ............................ 10-8
10.1.8. Module Mounting Location/LTG Allocation SSG(B):DE52............................ 10-8
10.1.9. Module Mounting Location/LTG Allocation SN(D):DE62 .............................. 10-9
10.1.10. Notes on Cabling the SN(B), SN(D)........................................................... 10-9
10.2. Message Buffer MB(D)................................................................................................... 10-27
RTGN with F:MB(D) and F:SNMUX(A) ................................................................ 10-27
10.2.0.1. HW and FW for MB(D) ................................................................ 10-29
10.2.0.2. MB(D) Frame layout..................................................................... 10-29
10.3.Standard Cabling............................................................................................................. 10-30
10.3.1. LTG Cabling................................................................................................ 10-30
10.3.2. MB(D) Cabling ............................................................................................ 10-37
10.3.2.1. Connecting cables MB(D) - MB(D), Cable group C .................... 10-37
10.3.2.2. Connecting Cables MB(D) - SN(B), Cable Group N.................... 10-37
10.3.2.3. Connecting Cables MB(D) - SN(D), Cable Group N ................... 10-38
10.3.2.4. Connecting Cables MB(D) - SSNC(C)........................................ 10-40
10.3.3. SN Cabling.................................................................................................. 10-41
10.3.3.1. Connecting Cables SNMUX(A) - SNCARE, Cable Group R ....... 10-41
10.3.3.2. Connecting Cables SNMAT - SNMUX, Cable Group R............... 10-41
10.3.3.3. Connecting Cables SNMAT – SNMUX (B), Cable Group R ........ 10-41
10.3.3.4. Connecting Cables SN(B):DE52, TSG – SSG............................ 10-43
10.4. Command Files.............................................................................................................. 10-48
P30305-X1118-U280-01-7618 0-7
10.4.1. CF.21.CONFIOP.........................................................................................10-48
10.4.2. CF.21.CONFPER .......................................................................................10-49
10.4.3. CF.21.CPTEST...........................................................................................10-51
10.4.4. CF.21.LTGSTA............................................................................................10-53
10.4.5. CF.21.RELBUF ...........................................................................................10-54
10.4.6. CF.21.STARTPRO .....................................................................................10-55
10.4.7. CF.21.SYSTAT............................................................................................10-57
10.4.8. CF.21.UPDFILES........................................................................................10-59
11. TEST TABLE......................................................................................................................10-1
12. CHANGE REQUESTS TO PROCEDURE .......................................................................12-1

查看積分策略說明
附件下載列表:
2007-6-8 10:17:25  下載次數(shù): 2
P30305-X1118-U280-01-7618.pdf (515.93 KB)
掃碼關(guān)注5G通信官方公眾號,免費領(lǐng)取以下5G精品資料
  • 1、回復(fù)“YD5GAI”免費領(lǐng)取《中國移動:5G網(wǎng)絡(luò)AI應(yīng)用典型場景技術(shù)解決方案白皮書
  • 2、回復(fù)“5G6G”免費領(lǐng)取《5G_6G毫米波測試技術(shù)白皮書-2022_03-21
  • 3、回復(fù)“YD6G”免費領(lǐng)取《中國移動:6G至簡無線接入網(wǎng)白皮書
  • 4、回復(fù)“LTBPS”免費領(lǐng)取《《中國聯(lián)通5G終端白皮書》
  • 5、回復(fù)“ZGDX”免費領(lǐng)取《中國電信5G NTN技術(shù)白皮書
  • 6、回復(fù)“TXSB”免費領(lǐng)取《通信設(shè)備安裝工程施工工藝圖解
  • 7、回復(fù)“YDSL”免費領(lǐng)取《中國移動算力并網(wǎng)白皮書
  • 8、回復(fù)“5GX3”免費領(lǐng)取《 R16 23501-g60 5G的系統(tǒng)架構(gòu)1
  • 共獲得 1 次點評 我要點評

    • 3a 威望 +20 個
      · 版主已閱,雖然不懂,鼓勵發(fā)帖 詳細(xì).. 發(fā)表與:2007-6-9 21:47:13
     
    [充值威望,立即自動到帳] [VIP貴賓權(quán)限+威望套餐] 另有大量優(yōu)惠贈送活動,請光臨充值中心
    充值擁有大量的威望和最高的下載權(quán)限,下載站內(nèi)資料無憂
    zhujiang_docomo
    初級會員
    鎵嬫満鍙風(fēng)爜宸查獙璇? style=


     發(fā)短消息    關(guān)注Ta 

    積分 408
    帖子 44
    威望 6439 個
    禮品券 8 個
    專家指數(shù) -125
    注冊 2008-6-15
    專業(yè)方向  core
    回答問題數(shù) 0
    回答被采納數(shù) 0
    回答采納率 0%
     
    發(fā)表于 2008-08-19 22:48:18 
    DE5x升級到DE6x的升級,估計在亞洲區(qū),我做的最多。

    有什么問題直接發(fā)mail給我哦。包括對DE60的升級,這是很少遇到的。最大升級到DE63,實際上從DE63到DE68的原理都是一樣的。只是多了一些光纖。

    對本帖內(nèi)容的看法? 我要點評

     
    [立即成為VIP會員,百萬通信專業(yè)資料立即下載,支付寶、微信付款,簡單、快速!]

    快速回復(fù)主題    
    標(biāo)題
    內(nèi)容
     上傳資料請點左側(cè)【添加附件】

    (勾選中文件為要刪除文件)


    當(dāng)前時區(qū) GMT+8, 現(xiàn)在時間是 2025-02-12 09:44:23
    渝ICP備11001752號  Copyright @ 2006-2016 mscbsc.com  本站統(tǒng)一服務(wù)郵箱:mscbsc@163.com

    Processed in 0.404075 second(s), 17 queries , Gzip enabled
    TOP
    清除 Cookies - 聯(lián)系我們 - 移動通信網(wǎng) - 移動通信論壇 - 通信招聘網(wǎng) - Archiver