MSCBSC 移動(dòng)通信論壇
搜索
登錄注冊
網(wǎng)絡(luò)優(yōu)化工程師招聘專欄 4G/LTE通信工程師最新職位列表 通信實(shí)習(xí)生/應(yīng)屆生招聘職位

  • 閱讀:1492
  • 回復(fù):0
[下載] CMU200-CDMA培訓(xùn)
sun6280309
入門會(huì)員



 發(fā)短消息    關(guān)注Ta 

積分 5
帖子 1
威望 2746 個(gè)
禮品券 0 個(gè)
專家指數(shù) 0
注冊 2011-12-2
專業(yè)方向  無線通信
回答問題數(shù) 0
回答被采納數(shù) 0
回答采納率 0%
 
發(fā)表于 2012-02-15 16:52:20  只看樓主 
【資料名稱】:CMU200-CDMA培訓(xùn)

【資料作者】:

【資料日期】:

【資料語言】:英文

【資料格式】:PDF

【資料目錄和簡介】:

Figure 1-1: Setup – Options menu..........................................................................................................1.1
Figure 4-1: Non-Signalling Menu............................................................................................................4.2
Figure 4-2: Measurement menu Analyzer / Generator...........................................................................4.3
Figure 4-3: Measurement Display Results (Analyzer / Generator).........................................................4.9
Figure 4-4: Connection Control – Analyzer Settings.............................................................................4.10
Figure 4-5: Connection Control – Analyzer Settings.............................................................................4.11
Figure 4-6: Connection Control – RF connectors.................................................................................4.12
Figure 4-7: Connection Control – Synchronization...............................................................................4.14
Figure 4-8: Group Configuration – Input Level......................................................................................4.16
Figure 4-9: Group Configuration – Internal...........................................................................................4.18
Figure 4-10: Group Configuration – Network........................................................................................4.18
Figure 4-11: CDMA applications in Signalling mode.............................................................................4.19
Figure 4-12: Connection Control – Signalling (Signal Off)....................................................................4.21
Figure 4-13: Connection Control – Signalling (Signal On)....................................................................4.23
Figure 4-14: Connection Control – Signalling (MS Registered)............................................................4.26
Figure 4-15: Function Overview – Main Menu Overview......................................................................4.29
Figure 4-16ower measurement menu (Gated Output displayed)....................................................4.32
Figure 4-17: Measurement menu Power – Open Loop Time Response..............................................4.34
Figure 4-18: Measurement results (Open Loop)...................................................................................4.35
Figure 4-19: Measurement menu Power – Minimum Output................................................................4.37
Figure 4-20: Measurement menu Power – Maximum Output...............................................................4.38
Figure 4-21: Measurement menu Power – Gated Output.....................................................................4.39
Figure 4-22: Display of measurement results (Gated Output screen)..................................................4.41
Figure 4-23: Power Configuration – Control.........................................................................................4.42
Figure 4-24: Power Configuration – Limit Lines....................................................................................4.44
Figure 4-25: Power Configuration – Limits............................................................................................4.45
Figure 4-26: Power Configuration – Statistics.......................................................................................4.46
Figure 4-27: Modulation errors..............................................................................................................4.47
Figure 4-28: Modulation Measurement Menu.......................................................................................4.48
Figure 4-29: Modulation Results Display..............................................................................................4.51
Figure 4-30: Overview O-QSPK display................................................................................................4.53
Figure 4-31: Phase Error display..........................................................................................................4.54
Figure 4-32: Magnitude Error display....................................................................................................4.55
Figure 4-33: Error Vector Magnitude display........................................................................................4.56
Figure 4-34: Modulation Control Configuration Display........................................................................4.57
Figure 4-35: Modulation Limits Configuration Display..........................................................................4.59
Figure 4-36: Modulation Statistics Configuration Display......................................................................4.59
Figure 4-37: Receiver Quality Measurement menu..............................................................................4.61
Figure 4-38: Measurement Display Results (Receiver Quality)............................................................4.64
Figure 4-39: Receiver Quality Configuration Control............................................................................4.65
Figure 4-40: Receiver Quality Configuration Limits..............................................................................4.67
Figure 4-41: Sensitivity Configuration Statistics....................................................................................4.68
Figure 4-42: Connection Control – Signalling (Test Call Established)..................................................4.69
Figure 4-43: Connection Control – Handoff..........................................................................................4.72
Figure 4-44: Connection Control – Handoff (Cont.)..............................................................................4.73
Figure 4-45: Connection Control – BS Signal.......................................................................................4.74
Figure 4-46:Connection Control – Network Parameters.....................................................................4.76
Figure 4-47:Connection Control – RF Connectors.............................................................................4.77
Figure 4-48: Connection Control – Synchronization.............................................................................4.78
Figure 4-49: Group Configuration – Internal.........................................................................................4.79
Figure 4-50: Group Configuration – Network........................................................................................4.79

查看積分策略說明
附件下載列表:
2012-2-15 16:52:20  下載次數(shù): 3
CMU200-CDMA培訓(xùn).pdf (2.51 MB)
掃碼關(guān)注5G通信官方公眾號(hào),免費(fèi)領(lǐng)取以下5G精品資料
  • 1、回復(fù)“YD5GAI”免費(fèi)領(lǐng)取《中國移動(dòng):5G網(wǎng)絡(luò)AI應(yīng)用典型場景技術(shù)解決方案白皮書
  • 2、回復(fù)“5G6G”免費(fèi)領(lǐng)取《5G_6G毫米波測試技術(shù)白皮書-2022_03-21
  • 3、回復(fù)“YD6G”免費(fèi)領(lǐng)取《中國移動(dòng):6G至簡無線接入網(wǎng)白皮書
  • 4、回復(fù)“LTBPS”免費(fèi)領(lǐng)取《《中國聯(lián)通5G終端白皮書》
  • 5、回復(fù)“ZGDX”免費(fèi)領(lǐng)取《中國電信5G NTN技術(shù)白皮書
  • 6、回復(fù)“TXSB”免費(fèi)領(lǐng)取《通信設(shè)備安裝工程施工工藝圖解
  • 7、回復(fù)“YDSL”免費(fèi)領(lǐng)取《中國移動(dòng)算力并網(wǎng)白皮書
  • 8、回復(fù)“5GX3”免費(fèi)領(lǐng)取《 R16 23501-g60 5G的系統(tǒng)架構(gòu)1
  • 對本帖內(nèi)容的看法? 我要點(diǎn)評

     
    [充值威望,立即自動(dòng)到帳] [VIP貴賓權(quán)限+威望套餐] 另有大量優(yōu)惠贈(zèng)送活動(dòng),請光臨充值中心
    充值擁有大量的威望和最高的下載權(quán)限,下載站內(nèi)資料無憂

    快速回復(fù)主題    
    標(biāo)題 [下載] CMU200-CDMA培訓(xùn)" tabindex="1">
    內(nèi)容
     上傳資料請點(diǎn)左側(cè)【添加附件】

    (勾選中文件為要?jiǎng)h除文件)


    當(dāng)前時(shí)區(qū) GMT+8, 現(xiàn)在時(shí)間是 2025-01-22 15:55:04
    渝ICP備11001752號(hào)  Copyright @ 2006-2016 mscbsc.com  本站統(tǒng)一服務(wù)郵箱:mscbsc@163.com

    Processed in 0.312573 second(s), 13 queries , Gzip enabled
    TOP
    清除 Cookies - 聯(lián)系我們 - 移動(dòng)通信網(wǎng) - 移動(dòng)通信論壇 - 通信招聘網(wǎng) - Archiver